A transparent pipeline of prospective climate investments, with named evidence gaps, delivery responsibilities and milestones. This is an invitation to conduct project preparation—not a request to transfer funds.

3existing demonstrator concepts
2additional scoping candidates
0investment-grade dossiers completed
0verified delivery outcomes claimed

THE FIVE-CANDIDATE DEVELOPMENT QUEUE

Five opportunities.
No invented readiness.

Sites, beneficiaries, budgets and implementers are not yet verified. The first three are published POIGAI concepts; the other two are research-screening candidates only and are not represented as approved project proposals.

D01 · CONCEPT · FIELD WORK PENDING

Ramanathapuram · Community water reliability

Assess seasonal household water supply and source quality before selecting engineering options.

Open existing concept dossier ↗

Cost
Pending village choice, source tests, quantities and local BOQ
Impact
Unique households; safe supply days; water-test compliance; collection time
Ownership
Panchayat/utility and maintenance operator to be confirmed
D02 · CONCEPT · FIELD WORK PENDING

Tiruchirappalli · Institutional heat adaptation

Instrument an occupied building, compare passive cooling interventions and measure hot-hour exposure.

Open existing concept dossier ↗

Cost
Pending building survey, area, design and vendor rates
Impact
Occupied overheating hours; temperature and energy use
Ownership
Building authority/facility operator not yet appointed
D03 · CONCEPT · FIELD WORK PENDING

Climate-smart farming demonstration

Screen a representative farmer cluster and season-specific water/soil/livelihood needs.

Open existing concept dossier ↗

Cost
Pending farmer cluster, selected crop and verified field quantities
Impact
Farmer net income; crop loss; irrigation per hectare
Ownership
Farmer group, agronomist and support agency to be contracted
D04 · SCOPING CANDIDATE · NOT A PROJECT

Puducherry region · Public-building heat and flooding

Choose a public-service facility, inspect stormwater links and evaluate heat-safe building options.

See preliminary regional evidence ↗

Cost
Not estimated; technical and administrative scoping required
Impact
People protected, service continuity, overheating hours
Ownership
Relevant municipal/facility authority to be identified
D05 · SCOPING CANDIDATE · NOT A PROJECT

Karaikal · Delta farming and safe-water resilience

Review existing water and agriculture schemes before a site-specific adaptation proposal.

See preliminary regional evidence ↗

Cost
Not estimated; hydrological assessment and BOQ required
Impact
Unique farmers; water reliability; comparable-season crop loss
Ownership
Local water and agricultural counterpart to be identified

STANDARD DONOR DOSSIER

The seven items every case must earn.

1. Geographic evidence

Site polygon or coordinates, hazard maps, jurisdiction and permissions.

2. Baseline & additionality

Measured conditions, public schemes, inequities and documented unmet need.

3. Independent technical scope

Options appraisal, safeguards, design assumptions and lifecycle alternatives.

4. Financial case

Bill of quantities, competing rates, taxes, contingency, operation and maintenance.

5. Delivery governance

Eligible recipient, implementation partner, maintenance owner, due diligence.

6. Measurable outcomes

Denominators, baseline, scenario targets, verifiers and follow-up dates.

Additional gate: written independent quality assurance and a risk/grievance register. A missing field is marked pending, never silently assumed complete.

OPEN IMPACT LEDGER — FIRST EDITION

Before, target, achieved.

BASELINE · NOT YET MEASURED

People helped, livestock, trees surviving, lakes restored, hectares, water saved, tCO₂e and cost per beneficiary cannot be reported until the intervention boundary is defined and field evidence gathered.

AFTER · NOT YET CLAIMED

No verified POIGAI project outcomes are represented here. Once delivery begins, future dashboards should publish independent checks at commissioning, 6/12 months and where appropriate at 36 months.

Every published indicator needs a unit, observation date, source, measurement method, accountable verifier and distinction between target and measured result. Read measurement and field registers ↗

TRANSPARENCY FOR GLOBAL CAPITAL

Make the next decision easy.

  1. 01 · Explore

    Read the evidence and initial concept with no sign-in.

  2. 02 · Enquire

    Specify your cause, location, country, organisation and preferred commitment pathway.

  3. 03 · Due diligence

    Request legal eligibility, independently costed project scope and safeguards.

  4. 04 · Contract

    Agree recipient eligibility, milestones, monitoring, disbursement and reporting.

  5. 05 · Verify

    Check independent outcomes, spending and maintenance over time.